<mark id="zdfn4"><video id="zdfn4"><output id="zdfn4"></output></video></mark>
<mark id="zdfn4"></mark>
<ul id="zdfn4"><rp id="zdfn4"></rp></ul>
  • <pre id="zdfn4"><dfn id="zdfn4"></dfn></pre>
    <em id="zdfn4"><span id="zdfn4"><fieldset id="zdfn4"></fieldset></span></em>

    1. <em id="zdfn4"><mark id="zdfn4"></mark></em>

      <abbr id="zdfn4"></abbr>
      <kbd id="zdfn4"><rp id="zdfn4"><tbody id="zdfn4"></tbody></rp></kbd>
      av男人的天堂在线观看国产,麻豆一区二区99久久久久,日韩精品无码不卡无码,日本一二三区视频在线,国产在线观看无码免费视频,国产又黄又爽又刺激的免费网址,在线亚洲人成电影网站色www,√天堂资源网最新版在线
      中文
      News
      News
      News and information

      Home > News > News Information

      Design the entire process of precision metal stamping molds
      Time : 2023-05-16 Click count : 1405

      1、 Product Introduction:

      1. Precision mold stamping convention product introduction process

      (a) Product drawing → Processing drawing → Layout drawing → Structural drawing → Assembly drawing → Mold drawing

      (b) Continuous mold layout and structural diagrams must be reviewed

      (c) The layout and structural diagram of the single punch mold must be reviewed

      (d) The mold drawings must be reviewed and signed to take effect, and the specifications of the drawings are clear

      2. Sample control process

      On site sample provision → self inspection → quality inspection department inspection → inspection report → inspection report confirmation → engineering department → customer

      2、 Mold design process

      1. Mold design process

      (1) Mold Design Flowchart:

      (2) This is the basic process of mold planning, and usually, the planned operations should be planned and implemented according to this process flow. Regarding the planning of some special products, based on this process, appropriate changes can be made according to the actual situation.

      2. Production standards for product drawings, open drawings, processing (process) drawings, and strip drawings

      (1)product drawingThe product images or samples used for mold making shall be provided by the customer and the document control center. Due to the fact that product drawings come from various customers with different standards, unclear drawings, incomplete markings, and confusing standards or testing criteria, errors may be overlooked by humans. Therefore, based on the original design, one should create their own product image for their own use while remaining faithful to the original design. Communicate with customer engineers in a timely manner regarding process issues in customer drawings. If the process or structural requirements are difficult to meet, it is possible to negotiate with the other party's engineer to solve the problem by reducing the process requirements, changing the product structure, or adding process auxiliary technologies. The customer's original drawings shall not be altered and shall remain unchanged. Accurately survey the samples provided by the customer and draw product drawings using various methods. Customer samples should be properly stored. The product drawings produced require accurate data, clear requirements, complete scale markings, reasonable public use, and easy inspection.

      (2)Working drawingAfter the product drawing review is approved, the processing drawing is formulated. The development of processing drawings should pay attention to the following points:

      A: The product scale values are divided into two situations: punching and dropping. The punching size is determined by the punch, and the cutting size is determined by the mold.

      B: The value of product services is based on the product drawings. If the service is marked on the product drawing, follow the drawing. If the service is not indicated on the product drawing, the service used by the customer shall prevail.

      Regarding the proportion that will increase after punching, the proportion of the machining drawing is 2/3 of its upper error, while the proportion of the machining drawing after punching will decrease, and the proportion of the machining drawing is 2/3 of its upper error. If the distance between the center and edge of the hole remains unchanged after punching, the value will be determined based on the center service.

      C: Consider the deformation trend of the product during the molding process and take some pre compensation measures for these deformation situations.

      (3)Open the pictureOpen the drawing according to the processing drawing and mark the length of each section for easy viewing.

      A: The outer layer of the board is subjected to tensile stress during the twisting process, while the inner layer is subjected to compressive stress. From stretching to compression, there is a transition layer that has neither tension nor pressure - the neutral layer. The length of the neutral layer during the bending process remains the same as before the bending, so the neutral layer is the benchmark for calculating the opening length of the bending part. The thickness of the neutral layer and the intermediate layer is a different concept. The direction of the neutral layer is related to the degree of deformation. The larger the radius of curvature, the smaller the bending viewpoint, and the smaller the degree of deformation. The neutral layer is located near the center of the thickness of the board; When the radius of curvature decreases, the bending viewpoint increases, and the degree of deformation correspondingly increases. The orientation of the neutral layer gradually moves towards the inner side of the curvature center. The interval from the neutral layer to the interior of the sheet metal is represented by λ.

      B: Open the basic formula of the accounting method: product open length=material compensation amount inside the material

      a: The principle of opening the R-angle is to keep the length of the neutral layer data unchanged.

      In R=Kt within R

      (4) Material strip diagram (process diagram, layout diagram)

      a. Based on customer requirements such as product accuracy, product output, mold life, and process characteristics, decide whether to use continuous molds or single process molds.

      b. Determine the classification of mold accuracy levels based on product requirements, total mold production volume, mold production speed, etc. Fine continuous molds are divided into four levels: A, B, C, and D. Fine single process molds are divided into three levels: A, B, and C.

      Among them, the follow-up of mold design also includes: drawing the final assembly drawing of the mold, drawing the structural side view, drawing the structural front view, placing standard parts, arranging the bending process, splitting template parts, brushing BOM list, hardware parts list, etc. I won't describe them one by one here.

      News Related news
      主站蜘蛛池模板: 永久天堂网 av手机版| 国产内射999视频一区| 日韩中文字幕区一区有砖一区| 国产欧美一区二区三区免费视频| 亚洲中文字幕精品久久| 日韩精品毛片无码一区到三区| 凤庆县| 国精产品999国精产品官网| 日本无遮挡吸乳视频| 日本视频高清一区二区三区| 国产成人无码一区二区三区在线| 国产偷国产偷亚洲清高动态图| 国产乱子伦一区二区三区四区五区| 平舆县| 无线日本视频精品| 精品人妻系列无码专区 | 苍溪县| 男女啪啪免费观看网站| 久久久无码精品午夜| 欧美激情一区二区三区在线| 无码成人1000部免费视频| 铅山县| 最近日本免费观看高清视频| 在熟睡夫面前侵犯我在线播放| av区无码字幕中文色| 欧美日韩欧美| 中文无码一区二区不卡av| 佛坪县| 亚洲精品成人片在线播放| 22222se男人的天堂| 波多野结衣中文字幕一区二区三区| 国产va免费精品高清在线观看 | 定边县| 一区二区三区人妻无码| 武山县| 么公的好大好硬好深好爽视频| 99久久国产宗和精品1上映 | 一本色道无码道在线观看| 粗大的内捧猛烈进出| 尤物yw193无码点击进入| 正在播放酒店约少妇高潮|